CALCULATORS / ASSEMBLY, CAPACITY AND MANUFACTURING ECONOMICS
Inspection sample-size screening calculator
Binomial probability of seeing at least one defect under random independent sampling.
SCENARIO COMPARISON
Compare the numbers.
This source describes an analytical model. Its quantities and checks are the view.
| Scenario | detection |
|---|---|
| 0.86738 | |
| 0.800699 |
All calculated quantities are listed with the inputs. Switch to Source to inspect the equations.
Change an input to see the consequences.
BASELINE INPUTS
CALCULATED
Edits change the baseline source.
Illustrative first-order example. Checks are editable requirements, not design standards. The broader topic may require additional equations, data, and validation.
Formula and units
This example uses the following equations. Input names and units match the editable source above.
- detection
detection = 1-(1-defectFraction)^sampleSize
Original worked example
These are the baseline values in the downloadable source. Edits above let you test your own values.
Given
- defect fraction
- 0.02
- sample size
- 100
Calculated
- detection
- 0.86738
Assumptions and limits
Binomial probability of seeing at least one defect under random independent sampling.
The requirement checks use the limits written in this example. Passing a check does not establish that the model covers every load, material behavior, or operating condition in a real design.
Download this .napkin example ↓Take it further with your agent
Napkin keeps the inputs, equations, checks and assumptions together in one study. Your agent sets it up; you change the numbers.
codex 'Use Napkin (https://napkin.engineering/mcp, or the local Napkin plugin) to build a study: Inspection sample-size screening. Inputs: lot assumptions; target error or detection probability; sample model. Outputs: sample size; stated statistical coverage. Model scope: Explicit process times, yield and costs supplied by the user. Read napkin_capabilities and the current snapshot. Ask me for the values that matter, label assumptions with units, author .napkin source, validate it and apply it with napkin_source using the current revision, then open the study. Add checks for the limits I supply. Keep unsupported analyses explicit.'Claude needs the Napkin connector; Codex needs the Napkin plugin. Set up your agent ↗
The broader study
The topic brief below describes the broader scope. The worked example above states the particular calculation it implements.
- Inputs: lot assumptions, target error or detection probability, sample model
- Outputs: sample size, stated statistical coverage
- Modes: calculate, compare, sweep
- Drawing: Process graph and cost curves
EXECUTABLE WORKED EXAMPLE · FIRST-ORDER MODEL · CHECK THE SCOPE & ASSUMPTIONS
More in assembly, capacity and manufacturing economics
- BOM and assembly unit-cost estimate calculator
- Manufacturing cycle-time estimate calculator
- Takt time and demand capacity calculator
- Production-line capacity calculator
- Work in progress and lead time calculator
- Multi-step process yield calculator
- Make-or-buy cost comparison calculator
- Fixture cost amortization calculator
- Stock nesting and material yield calculator
- Manufacturing energy per good part calculator
- Embodied-carbon screening calculator